State boosts critical battery storage project at Camp Pendleton with $42 million
California funds long-duration battery at Camp Pendleton substation.
Key developments first.
Reading
California funds long-duration battery at Camp Pendleton substation.
Contract W912PP22C0005 from Department of the Army to HSGS-AMERESCO, LLC for $10,637,569. Description: ERCIP MICRO-GRID, WSMR. Period starts 2022-08-15.
Fort Hunter Liggett all-renewable microgrid commissioned.
No-notice eight-hour blackout at Fort McCoy.
6 MW / 6 MWh battery at Fort Detrick, step toward a microgrid.
Fervo (NAS Fallon), GreenFire (NAF El Centro), Sage (Fort Bliss) added.
Army confirms West Fort Cavazos microgrid completion.
Fort Benning (then Moore) tested with transmission feed shut down.
DOE picks $39.9M Navy/HECO/Ameresco microgrid at Pearl Harbor-Hickam.
Includes Anniston microgrid sized for 14+ days and Portsmouth NSY power plant resiliency.
Hill AFB cut commercial power for 10 hours.
Coverage of Army microreactor solicitation for installations.
I2AP: microgrids at 14 AF + 2 USSF bases by FY2030; ERREs at 25 bases by FY2027.
Contract M9549418F0016 from Department of the Navy to CONCURRENT TECHNOLOGIES CORP for $41,092,564. Description: GF ENERGY RESILIENCE AND RELIABILITY SUPPORT. Period starts 2018-09-04.
Navy campaign plan for installation energy readiness.
Maxwell AFB/Gunter cut commercial power for an ERRE.
DIU picks Eavor (JBSA), Teverra (Fort Wainwright), Zanskar (Mountain Home, Fort Irwin).
Guam bases depend on Guam Power Authority; Typhoon Mawar outages.
Officials say Chinese malware hidden in grids, water and comms that feed U.S. bases.
Fort Drum's first black-start exercise.