Library
Key developments first.
Reading
Key developments first.
Reading
Directs War Dept to seek coal PPAs for installations for grid reliability and on-site fuel security.
The project’s goal is to provide resilience through the microgrid and energy storage systems to power 40 percent of its critical facilities. The contract also addresses water infrastructure and security needs while decreasing energy and water consumption.
The U.S. Army Engineering and Support Center, Huntsville completed repairs of emergency fuel infrastructure at U.S. Naval Support Facility, NSF, Diego Garcia. The $1.5 million Petroleum, Oil and Lubricants, POL, Pier Pipeline was repaired and operational 17 days ahead of schedule, reinforcing the installation’s ability to sustain uninterrupted operations in the Indo-Pacific region.
Contract SP060418F8001 from Defense Logistics Agency to ENERGY SYSTEMS GROUP, LLC for $18,111,201. Description: IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT. Period starts 2018-04-12.
Contract FA239424CB002 from Department of the Air Force to THE GLOBAL CONNECTIVE CENTER LLC for $8,999,917. Description: GRAPE - SUSTAINABLE SOLAR-HYDROGEN MICROGRID. Period starts 2024-02-28.
Contract N3943020F9901 from Department of the Navy to AMERESCO INC for $75,315,725. Description: ENERGY SAVINGS PERFORMANCE CONTRACT FOR NORFOLK NAVAL SHIP YARD, PORTSMOUTH, VIRGINIA.. Period starts 2019-12-12.
Contract W912QR25CA030 from Department of the Army to CITY LIGHT & POWER JBLM LLC for $28,047,244. Description: JOINT BASE LEWIS-MCCHORD GRAY ARMY AIRFIELD POWER GENERATION AND MICROGRID CONSTRUCTION. Period starts 2025-09-24.
Contract SP060419F8002 from Defense Logistics Agency to SCHNEIDER ELECTRIC BUILDINGS AMERICAS, INC. for $31,966,911. Description: IGF::CT::IGF AWARD OF ENERGY SAVINGS PERFORMANCE CONTRACT. Period starts 2019-01-15.
Contract N3943017F1903 from Department of the Navy to TRANE U.S. INC. for $8,126,095. Description: IGF::OT::IGF ENERGY SAVINGS PERFORMANCE CONTRACT FOR NAVAL AIR STATION OCEANA, VIRGINIA TO INCLUDE LIGHT AND ENERGY RELATED PROCESS IMPROVEMENTS AND RENEWABLE ENERGY SYSTEMS. Period starts 2016-10-26.
Contractor working under the management of Huntsville Center’s REM program, is the technical link powering the Army Reserve’s unified energy control system.
NAS Sigonella solar+battery microgrid (Jan 2026); older, logged silently.
FY27 request $694.3M ERCIP construction; Redstone, Kitsap, Camp Roberts, F.E. Warren etc.
Earlier carrier-to-shore power test report. Older; logged silently.
Earlier report of carrier-to-shore power plan (originally Ford). Older background.
GAO-26-107786: DOD disaster cost tracking incomplete; installations lack data/funding for resilience upgrades.
$26.95M ERCIP microgrid award at White Sands Missile Range.
Oklo says Eielson site characterization underway, drilling late 2026.