Oct 16 first Janus site visit at Fort Benning with Radiant; preferred reactor site identified, final approval pending environmental/cultural surveys. Surfaced as catch-up 2026-10-26.
Oct 6-7 Fort Hood/GA-EMS Janus meetings; 5 MW base-load reactor (~5% of installation demand), candidate site near Yoakum-DeFrenn Army Heliport. Surfaced as catch-up 2026-10-26.
$51.6M HSGS-Ameresco award (Sept 18): installation-wide black-start microgrid with 10 MW new gas generation at Anniston Army Depot, due Apr 2029. Surfaced as catch-up 2026-10-26.
Threat assessment on civilian infrastructure attacks affecting bases. Older; logged silently.
Small rooftop solar arrays via IGSA with Center Line ($347K Bldg 229; Bldgs 203/231 next); no islanding. Background only.
Rewrite of Fort Buchanan $45M microgrid. Duplicate.
USACE Alaska District RFI W911KB279A007 (Oct 2) for Eielson microreactor synchronization infrastructure; market research only, not a contract. Surfaced as catch-up 2026-10-26.
Award listing for 178th Wing microgrid. Duplicate.
USACE Louisville RFI weighing OTA progressive design-build for ERCIP microgrids: Fort Sill 18 MW black-start natural gas plant + microgrid (14+ day critical loads) and Camp Parks PRFTA microgrid expansion to full peak critical load. Market research only. Surfaced as catch-up 2026-10-26 PM.
Notice listing for JBMDL microgrid. Duplicate of above.
Map explainer of Janus sites and FORTRESS. Duplicate.
Local explainer on Fort Campbell's Aug TVA non-binding MOU and Janus BWXT reactor; no new decision. Older facts; logged silently.
Rewrite of Fox 90-day report. Duplicate.
Routine Fort Knox 15-minute generator-switch test Oct 13. Older; logged silently.
Rewrite of Fox 90-day report. Duplicate.
FORTRESS: every major U.S. installation to generate its own power independent of civilian grid; Next Great American Base to be fully off-grid.
Rock Island award record. Duplicate.
Ohio ANG 178th Wing (Springfield) awarded Big Shine Worldwide ~$8.21M (W50S8Q26CA002, Sept 29) for basewide microgrid system construction. Surfaced as catch-up 2026-10-27 AM.
Bid abstract for JBMDL microgrid. Duplicate of above.
USACE NY opened bids Sept 28 for JBMDL (McGuire AFB) microgrid: 2x500 kW gas gens, 3x500 kW/500 kWh batteries, ~400 kW solar, black-start of 2.5 MW critical loads within 60 s; gov estimate $16.43M, low bid PKF-Mark III $11.35M; no award yet, funds not yet appropriated. Surfaced as catch-up 2026-10-27 AM.
Award notice W912QR26CA041 for Rock Island microgrid. Duplicate of above.
$99.7M ERCIP award: 15 MW combined heat and power plant plus microgrid with black start and islanding at Lake City Army Ammunition Plant, due July 2029. Surfaced as catch-up 2026-10-26.
$131.9M USACE award for Cape Cod SFS radar-site microgrid (generators, BESS, wind tie-in, HEMP hardening), completion Sept. 13, 2030.