Army introduces strategy to combat climate change threats
Official Army Climate Strategy release with microgrid-per-installation goal.
Key developments first.
Reading
Official Army Climate Strategy release with microgrid-per-installation goal.
DoD plan describes ~$469M planned for microgrids.
Services expanding no-notice blackout drills; NAVFAC planning three black starts in 2022.
First regional ERRE across Schriever, Buckley, Peterson; DoD at 10 ERREs since FY2020.
Requires microgrid/islanding assessment (7+ days) in new construction; long-duration storage demo.
Contract 0018 from Department of the Army to JOHNSON CONTROLS GOVERNMENT SYSTEMS, LLC for $7,553,545. Description: ENERGY SAVINGS PERFORMANCE CONTRACT IGF::OT::IGF. Period starts 2015-07-28.
Fort Hood kept running through Winter Storm Uri; later faced ~$30M power bill.
Air Force plan treats 30-day EMP/GMD grid outage as a planning scenario.
Reinforced 99.9% critical-load availability; emergency-generator microgrid pilot; on-site energy projects.
Supersedes AD 2017-07; default 14 days of energy and water for critical missions; requires IEWPs.
SCO/DOE begin EIS for a 1-10 MWe HALEU TRISO prototype, citing 10 USC 2911.
Contract W912HQ17C0003 from Department of the Army to RAYTHEON COMPANY for $8,777,364. Description: IGF::OT::IGF --EW-201606: HYBRID MICROGRID WITH HIGH PENETRATION WIND FOR ISLANDING AND HIGH VALUE GRID SERVICES. Period starts 2016-11-07.
3,018 utility outages, 649 lasting 8+ hours, reported across DoD.
Army Reserve plans solar+battery microgrid at Fort Hunter Liggett.
Tyndall ran on diesel generators 6-8 days after Hurricane Michael; lessons on fuel diversity.
Foundational: Army installations must sustain critical missions >=14 days of energy/water; Installation Energy and Water Plans.
Directed black-start exercises at major installations and boosted energy resilience programs.
Air Force tallies energy resilience analyses, tabletops and pull-the-plug exercises; warns adversaries target grid.
OSD had run four black-start exercises ($250-500K each); Air Force logged ~240 notable outages in FY2018.
DOE categorical exclusion for supporting Pele Phase I design.
Contract SP060002F8255 from Defense Logistics Agency to CONSTELLATION NEWENERGY INC for $10,891,036. Description: ENERGY SAVINGS PERFORMANCE CONTRACT. Period starts 2001-09-14.
SCO solicited two-phase mobile microreactor design/build, up to $45M per Phase I agreement.