“The model that we’re trying to drive on is not me having to go back up on Capitol Hill with my hand out,” Assistant Secretary of Defense for Energy, Installations, and Environment Dale Marks told Breaking Defense.
FORTRESS rulesLaws and budgetsBase microgridsTalkNeutral tone
ASW(EI&E) Dale Marks at Association of Defense Communities convention, Tampa: FORTRESS installations to use public-private model and be designed to run on own infrastructure for 30 days fully detached from external utilities (vs. reported 90-day figure); NGAB prototype with microgrids + small reactor, air-gapped networks, closed-loop water; lessons to be exported to legacy bases. Surfaced 2026-10-29 PM.
Next Great American BaseFORTRESS rulesBase microgridsSmall reactorsTalkReassuring
Crane is one of four Navy installations chosen to advance private-sector proposals for large-scale energy (incl. SMRs) and AI data center infrastructure on federal land; tied to FORTRESS. Surfaced 2026-10-29 AM.
Small reactorsNext Great American BaseFORTRESS rulesBase microgridsActionReassuring
Acting SECNAV Hung Cao (Oct 28): Navy moving ahead with SMRs at four installations incl. NSA Crane; Dec 1 test with CVN-79 John F. Kennedy reactor powering Norfolk naval base. Surfaced 2026-10-29 AM.
Small reactorsBase microgridsLaws and budgetsActionNeutral tone
Marine Corps FRCS PM Jimmy Mahoney (TechNet Indo-Pacific, Oct 27): UniCRN framework pairing cyber and facility-controls staff to secure base power/water/fuel/HVAC OT, zero trust, OT test bed; expanding from Camp Lejeune to other installations. Surfaced 2026-10-28 PM.
Cyber threatsBase microgridsLaws and budgetsTalkNeutral tone
AFWERX SBIR Phase I (~$75K, FA864926P0359) for AI digital twin of forward-deployed diesel+battery microgrid to cut fuel use. Surfaced 2026-10-28 PM as minor item.
Base microgridsContractsLaws and budgetsActionReassuring
Army's Project Installation Resiliency and Mission Assurance (IRMA) unveiled: proof-of-concept tool aggregating installation power/water OT sensor data and mapping dependencies to mission systems vs cyber/physical threats; piloted at Fort Huachuca, roadmap to Army-wide scaling. Surfaced 2026-10-26 PM.
Cyber threatsBase microgridsPhysical attacksLaws and budgetsActionNeutral tone
The U.S. Army Engineering and Support Center, Huntsville, closed fiscal 2026 on Sept. 30 with $2.49 billion obligated across programs supporting military readiness, installation resilience and specialized engineering requirements for military services and federal partners worldwide.
USACE Power Reliability Enhancement Program moved under Huntsville Center; ran 12 Black Start Exercises this year (7 Army, 4 Air Force, 1 Navy), each cutting commercial power for at least 8 hours. Surfaced 2026-10-26 PM.
Pull the plug drillsBase microgridsLaws and budgetsActionReassuring