Department of the Army awards $22.0M to AMERESCO INC: The Effort Includes Design, Construction, Commissioning, Validation, Training And Transition Of A Fully Usable And Complete Microgrid System Designed To Provide Contingency Electric Power To Ft. Hunter Liggett W Hen Electricity Provided By Pacifi
Read at usaspending.govContract W9123819C0012 from Department of the Army to AMERESCO INC for $21,961,884. Description: THE EFFORT INCLUDES DESIGN, CONSTRUCTION, COMMISSIONING, VALIDATION, TRAINING AND TRANSITION OF A FULLY USABLE AND COMPLETE MICROGRID SYSTEM DESIGNED TO PROVIDE CONTINGENCY ELECTRIC POWER TO FT. HUNTER LIGGETT W HEN ELECTRICITY PROVIDED BY PACIFIC GAS AND ELECTRIC (PG&E) IS UNSTABLE OR UNAVAILABLE. THE FINAL SYSTEM DESIGN SHALL ADVANCE DEPARTMENT OF ARMY ENERGY SECURITY AND SUSTAINABILITY STRATEGY (E2S) AND OTHER ENERGY POLICY OBJECTIVES INCLUDING CONTINUITY OF OPERATION, ADAPTABLE POWER DELIVERY ENERGY, ENERGY INFORMED OPERATIONS, OPTIMIZED ENERGY USE, ASSURED ACCESS, ENERGY RESILIENCY, AND ARMY CYBERSECURITY AND RISK MANAGEMENT REQUIREMENTS. IGF::OT::IGF. Period starts 2019-04-12.